Then Ardi remembered something. On page 289, buried in the annexes: “Për materialet e importuara me çmim doganor mbi referencën manuale, kontraktori mund të aplikojë me faktura.” For imported materials with customs value above the manual’s reference, the contractor could apply with invoices.
Ardi stepped forward. He had a small construction firm—just 14 workers, two excavators, and a lot of debt from a stalled apartment building in Kamëz. He was bidding on a school renovation in Durrës. Small job. Low margin. But if he won, it would keep his crew busy through July. manuali i cmimeve te ndertimit 2024
Ardi had been a site engineer for twelve years. He’d survived the price chaos of 2022 when a bag of cement jumped 40% overnight. He’d seen subcontractors walk off sites in 2023 when diesel hit 300 lekë per liter. But this—this thin manual—was different. This was the government’s final word on how much a brick, a beam, or a bucket of paint was allowed to cost in public works. Then Ardi remembered something
It was the Manuali i Çmimeve të Ndertimit 2024 . He had a small construction firm—just 14 workers,
He pulled out his pen. On the bid form, he wrote his total: 48,720,000 lekë. Exactly 5.8% above the manual’s baseline, but justified by four attached invoices and a notarized exchange rate statement from the Bank of Albania.